[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-728829":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},728829,474,2,"多选题","在简化的分批法下,（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","在产品完工之前,产品成本计算单只登记直接材料费用和生产工时",true,{"key":16,"text":17,"correct":18},"B","在产品完工之前,产品成本计算单既要登记直接计入费用,又要登记间接计入费用",false,{"key":20,"text":21,"correct":14},"C","在基本生产成本二级账中,既要登记直接计入费用,又要登记间接计入费用",{"key":23,"text":24,"correct":14},"D","只在有完工产品的那个月份,才计算完工产品成本",{"key":26,"text":27,"correct":14},"E","不分批计算在产品成本","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"专业知识综合卷","会计财税",0]