[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-728755":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},728755,474,2,"多选题","下列需要分配计入“直接材料”成本项目的是（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","多个产品共同消耗的辅助材料",true,{"key":16,"text":17,"correct":18},"B","车间消耗的主要材料",false,{"key":20,"text":21,"correct":18},"C","车间消耗的辅助材料",{"key":23,"text":24,"correct":14},"D","多个产品共同消耗的主要材料",{"key":26,"text":27,"correct":18},"E","管理部门消耗的主要材料","AD","",{"id":6,"name":31,"category":32,"favorite":33},"专业知识综合卷","会计财税",0]