[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-728631":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},728631,474,2,"多选题","弹性预算一般适用于（）",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","销售预算",false,{"key":16,"text":17,"correct":14},"B","固定成本",{"key":19,"text":20,"correct":14},"C","人员预算",{"key":22,"text":23,"correct":24},"D","混合成本",true,{"key":26,"text":27,"correct":24},"E","变动成本","DE","弹性预算，依据业务量、成本和利润之间的联动关系来编制的，理论上，适用于编制全面预算中所有与业务量有关的预算，但实务中主要用于编制成本费用预算和利润预算",{"id":6,"name":31,"category":32,"favorite":33},"专业知识综合卷","会计财税",0]