[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-728498":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},728498,474,2,"多选题","下列说法正确的是（）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","约束理论中的生产计划与控制是通过控制各个生产环节的生产能力均衡来实现的",false,{"key":16,"text":17,"correct":18},"B","TOC理论是基于一个约束环境下的产出最大化为目标，关注瓶颈资源是它的核心内容",true,{"key":20,"text":21,"correct":14},"C","一个企业的瓶颈工序是固定的",{"key":23,"text":24,"correct":18},"D","一个企业的瓶颈工序是动态变化的",{"key":26,"text":27,"correct":18},"E","约束理论中的生产计划与控制是通过控制各个生产环节的生产节奏均衡来实现的","BDE","约束理论中的生产计划与控制不是控制各个生产环节的生产能力均衡，而是通过控制各个环节的生产节奏，即用“鼓点”来控制生产系统",{"id":6,"name":31,"category":32,"favorite":33},"专业知识综合卷","会计财税",0]