[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-728492":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},728492,474,2,"多选题","项目管理知识体系中把项目管理过程分为（）步骤。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","启动",true,{"key":16,"text":17,"correct":14},"B","计划",{"key":19,"text":20,"correct":14},"C","执行",{"key":22,"text":23,"correct":14},"D","控制",{"key":25,"text":26,"correct":14},"E","结束","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"专业知识综合卷","会计财税",0]