[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-728254":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},728254,474,1,"单选题","设置产品成本项目的主要目的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","反映企业在一定时期内发生了哪些费用",false,{"key":16,"text":17,"correct":18},"B","反映产品成本的构成情况",true,{"key":20,"text":21,"correct":14},"C","为计算工业净产值提供资料",{"key":23,"text":24,"correct":14},"D","为核定生产资金提供资料","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识综合卷","会计财税",0]