[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-728198":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},728198,474,1,"单选题","分步法下，在产品按完工半成品或产成品计价的方法适用于（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","原材料占全部成本比重比较大的在产品",false,{"key":16,"text":17,"correct":18},"B","已基本上接近完工的在产品",true,{"key":20,"text":21,"correct":14},"C","定额成本制定比较完善的在产品",{"key":23,"text":24,"correct":14},"D","在产品的数量每月基本固定","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识综合卷","会计财税",0]