[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-728065":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},728065,474,1,"单选题","对不影响预算目标的业务预算、费用预算、投资预算等内部各项目间的调整,这种调整方式称之为（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预算外调整",false,{"key":16,"text":17,"correct":18},"B","预算内调整",true,{"key":20,"text":21,"correct":14},"C","滚动预算",{"key":23,"text":24,"correct":14},"D","年度预算调整","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识综合卷","会计财税",0]