[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-727913":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},727913,474,1,"单选题","采用简化分批法,在产品完工之前，产品成本明细账（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","不登记任何费用",false,{"key":16,"text":17,"correct":14},"B","只登记直接材料费用",{"key":19,"text":20,"correct":14},"C","登记间接计入费用,不登记直接计入费用",{"key":22,"text":23,"correct":24},"D","只登记直接计入费用(如直接材料费用)和生产工时",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识综合卷","会计财税",0]