[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-727889":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},727889,474,1,"单选题","作业成本管理与传统成本管理的显著区别,在于将企业视作为满足顾客需要而设计的一系列（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","作业",false,{"key":16,"text":17,"correct":14},"B","作业动因",{"key":19,"text":20,"correct":14},"C","价值链",{"key":22,"text":23,"correct":24},"D","作业的集合体",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识综合卷","会计财税",0]