[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-727863":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},727863,474,1,"单选题","适用于季节性生产企业分配制造费用的方法是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","机器工时比例法",false,{"key":16,"text":17,"correct":14},"B","生产工人工资比例分配法",{"key":19,"text":20,"correct":21},"C","按年度计划分配率分配法",true,{"key":23,"text":24,"correct":14},"D","生产工人工时比例分配法","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识综合卷","会计财税",0]