[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-697386":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},697386,467,2,"多选题","根据设备的( )等情况，正确选取吊点或绑点位置，并应优先选用设备原（指定）吊点。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","结构",true,{"key":16,"text":17,"correct":14},"B","重量",{"key":19,"text":20,"correct":14},"C","重心位置",{"key":22,"text":23,"correct":24},"D","盛装介质",false,"ABC","",{"id":6,"name":28,"category":29,"favorite":30},"(Q1)起重机械指挥","特种作业",0]