[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-696669":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},696669,467,1,"单选题","安装、改造、维修单位应当在施工验收后( )日内，将安装、改造、维修的技术资料移交使用单位。",[11,15,19],{"key":12,"text":13,"correct":14},"A","15",false,{"key":16,"text":17,"correct":18},"B","30",true,{"key":20,"text":21,"correct":14},"C","45","",{"id":6,"name":24,"category":25,"favorite":26},"(Q1)起重机械指挥","特种作业",0]