[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-848396":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},848396,464,3,"判断题","TRT电抗器检修时,安装拆除接地线的顺序:安装时,先接接地端,后接母线端;拆除时,先拆母线端,后拆接地端。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"煤气作业","特种作业",0]