[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-847530":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},847530,464,1,"单选题","承担大、中检修的施工单位要提前()将检修计划及安全措施抄送安全处有害气体检查站,并办理煤气设备(管网)安全检修审核手续。",[11,15,19],{"key":12,"text":13,"correct":14},"A","1天",false,{"key":16,"text":17,"correct":18},"B","3天",true,{"key":20,"text":21,"correct":14},"C","2天","",{"id":6,"name":24,"category":25,"favorite":26},"煤气作业","特种作业",0]