[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-847484":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},847484,464,1,"单选题","地下煤气管道试压时,应在管顶铺()cm的土层覆盖。",[11,15,18],{"key":12,"text":13,"correct":14},"A","30",false,{"key":16,"text":17,"correct":14},"B","40",{"key":19,"text":20,"correct":21},"C","50",true,"",{"id":6,"name":24,"category":25,"favorite":26},"煤气作业","特种作业",0]