[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-847277":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},847277,464,1,"单选题","波形补偿器安装时应()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","注水",false,{"key":16,"text":17,"correct":14},"B","打压",{"key":19,"text":20,"correct":21},"C","温度校正",true,"",{"id":6,"name":24,"category":25,"favorite":26},"煤气作业","特种作业",0]