[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-840737":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},840737,458,3,"判断题","建设项目安全设施设计通过审查后,企业可以自主确定投入生产(使用),不申请竣工验收。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"重氮化工艺作业","特种作业",0]