[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-840082":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},840082,457,3,"判断题","生产准备应包括:组织机构(附组织机构图)、人员准备及培训、技术准备及编制《投料试车总体方案》(附投料试车统筹网络图)、物资准备、资金准备、外部条件准备和营销准备。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"氧化工艺","特种作业",0]