[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-838013":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},838013,456,3,"判断题","危险化学品建设项目安全设施的设计人、设计单位应当对建设项目“三同时”负责。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"硝化工艺","特种作业",0]