[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-817876":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},817876,451,3,"判断题","水压试验时,在设备、管线的试验压力停留时间不少于5分中,然后降至最高工作压力,在此压力下,检查器壁、管壁,用0.5~1.5kg的手锤轻敲各焊缝处,查看是否有渗漏现象。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"聚合工艺","特种作业",0]