[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-816245":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},816245,451,1,"单选题","开车网络图是以时间为横坐标,以()为纵坐标的图表。",[11,15,19],{"key":12,"text":13,"correct":14},"A","开车步骤",false,{"key":16,"text":17,"correct":18},"B","各单元运行情况",true,{"key":20,"text":21,"correct":14},"C","聚合反应负荷","",{"id":6,"name":24,"category":25,"favorite":26},"聚合工艺","特种作业",0]