[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-807347":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},807347,450,1,"单选题","安全验收评价是在工程项目的()阶段进行。",[11,15,19],{"key":12,"text":13,"correct":14},"A","设计阶段",false,{"key":16,"text":17,"correct":18},"B","建设项目竣工,试生产运行正常后",true,{"key":20,"text":21,"correct":14},"C","建设项目投入使用后","",{"id":6,"name":24,"category":25,"favorite":26},"加氢工艺","特种作业",0]