[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-776553":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},776553,441,1,"单选题","焊工施焊前的准备工作不包括（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","焊接工艺卡的编审",true,{"key":16,"text":17,"correct":18},"B","坡口的制备与清洁",false,{"key":20,"text":21,"correct":18},"C","焊件的组对",{"key":23,"text":24,"correct":18},"D","查阅对应的焊接工艺卡","",{"id":6,"name":27,"category":28,"favorite":29},"承压焊","特种作业",0]