[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-768741":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},768741,440,1,"单选题","PDCA循环管理计划、实施、检查和()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","损失",false,{"key":16,"text":17,"correct":18},"B","处理",true,{"key":20,"text":21,"correct":14},"C","措施","",{"id":6,"name":24,"category":25,"favorite":26},"司钻作业-钻井作业","特种作业",0]