[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-20156":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},20156,44,2,"多选题","CSE评价模式的实施步骤包括（ ）",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","需要评定",true,{"key":16,"text":17,"correct":14},"B","方案计划",{"key":19,"text":20,"correct":14},"C","形成性评价",{"key":22,"text":23,"correct":14},"D","总结性评价",{"key":25,"text":26,"correct":27},"E","方案实施",false,"ABCD","CSE评价模式的实施步骤主要有:需要评定、方案计划、形成性评价、总结性评价。",{"id":6,"name":31,"category":32,"favorite":33},"教师招聘 (小学)","教师",0]