[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-764822":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},764822,437,3,"判断题","套管修复施工方案应包括如下内容:事故井的基本数据、套管修复的目的与要求、套管修复措施、所需工具设备和审批程序。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"司钻作业-井下作业","特种作业",0]