[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-432-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},432,"尾矿作业","特种作业",0,9,50,742,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},755423,3,"判断题","山谷型尾矿库的排洪系统要建立防堵塞措施,还要有解决泥石流对尾矿库侵害的可行措施。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},755425,"各测点中的最低点作为尾矿库滩顶标高。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},755426,"渠槽法筑坝子堤大小与池填法的围埝不同。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},755428,"坝外坡面维护工作应按设计要求进行。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},755430,"测量断面不应垂直于坝轴线布置。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},755432,"由于坝基土产生渗透破坏而漏砂。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},755434,"堆积坝每堆成一段,不必进行护坡,修好排水沟。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},755436,"对重要的坝应按设计规定作出降雨量及洪水量等记录。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},755437,"暴雨、地震之前可能对坝体、排洪构筑物造成病害。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},755439,"地下矿山开采过程中会存在高处坠落和淹溺等危险、危害因素。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},755441,"量水堰不应靠近坝趾设置。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},755443,"矿体周围有经济价值的岩石(废石)称为围岩。矿体上部的围岩叫上盘围岩或顶板,矿体下部的围岩叫下盘围岩或底板。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},755444,"注意做好经常性的维护工作,增加外界因素对坝坡稳定的影响。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},755446,"水质监测主要是测定渗流水中的固体和化学成份的变化。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},755448,"在导线、电气设备、变压器、油开关附近,不得有损坏电气绝缘或引起电气火灾的热源。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},755450,"技术档案资料是尾矿库安全生产,维护,治理的重要依据。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},755452,"放矿支管的分布间距、长度、管径的大小可不根据各矿山尾矿性质、排尾量等情况确定。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},755454,"1、2级山谷型尾矿坝的渗流应按三维计算或由模拟试验确定。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},755456,"平硐开拓速度快,投资成本低,管理方便。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},755458,"尾矿库使用的特点是尾矿量由少到多,尾矿坝由矮到高,在不同使用期事,造成危害的严重程度是不同的。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},755461,"经常调整放矿地点,使滩面沿着平行坝轴线方向均匀整齐。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},755462,"尾矿库库内排水构筑物通常由进水构筑物和输水构筑物两部分组成。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},755464,"未能均匀放矿,沉积滩此起彼伏,造成局部坝段干滩过长。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},755466,"矿上涨速度较缓,可采取分片分期交替堆存的方法,以减少蒸发渗漏或作事故备用场。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},755468,"对于滑坡体上部已松动的土体,应彻底挖除,然后按坝坡线分层回填夯实。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},755470,"尾矿库内水位越低越好。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},755472,"坝前沉积大片矿泥会抬高坝体外的浸润线。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},755473,"加强周边放矿会加速形成防渗层,增加渗漏和落水洞事故。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},755475,"尾矿坝位移观测一般只进行垂直位移观测。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},755477,"尾矿库宜采用排水井(斜槽)一排水管(隧洞)排洪系统。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},755479,"尾矿浓缩是为了增加尾矿的输送浓度。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},755481,"现场神志不清、精神萎靡者属危重伤病员。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},755483,"尾矿库病害的治理和抢险工作也属于安全管理范畴。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},755485,"只有在保证安全的前提下才允许适当储水。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},755487,"所以汛期前的调洪演算是重要的一环。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},755488,"较快加高或加宽子坝,不满足洪水位时的干滩长度的需要。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},755491,"电伤是指电流的热效应、化学效应和机械效应对人体的伤害;主要指电弧烧伤、熔化金属溅出烫伤等。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},755492,"汇水面积的计算有条件时应结合现场洪水调查予以验证。",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},755494,"雨季期间应指定专人负责守护排洪关口。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},755496,"确保主坝坝体的安全要在主坝坝顶上开沟泄洪。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},755498,"电流作用于人体的时间长短,对人体的伤害程度没有影响。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},755500,"干法筑坝工艺不可用于制砖、制水泥和填坑造地等。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},755501,"尾矿库的观测是一项多工种多专业形式的测量活动。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},755503,"子坝的堆筑方法主要有冲积法、池填法、渠槽法和旋流器法等。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},755505,"冰冻季节宜采取库内冰下集中放矿。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},755507,"坝端无截水沟,山坡雨水冲刷坝肩为正常库。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},755508,"坝下独管放矿导致沉积滩的坡度变缓。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},755510,"在开采矿体时,一般要将整个矿床划分为阶段,再把阶段划分为采区或矿块。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},755512,"独管头放矿在实际生产过程中经常使用,不影响坝体的安全。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},755513,"浓缩机不宜时开时停,以免发生堵塞或卡机事故。",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,332,335,338],{"id":324,"name":325,"category":7,"favorite":326},401,"高处安装、维护、拆除",1,{"id":328,"name":329,"category":7,"favorite":8},335,"(A)特种设备安全管理",{"id":331,"name":329,"category":7,"favorite":8},336,{"id":333,"name":334,"category":7,"favorite":8},340,"D1压力管道巡检维护",{"id":336,"name":337,"category":7,"favorite":8},343,"(G1)工业锅炉司炉",{"id":339,"name":340,"category":7,"favorite":8},353,"(N1)叉车司机"]