[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-432-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":420},{"id":5,"name":6,"category":7,"favorite":8},432,"尾矿作业","特种作业",0,8,50,742,[13,31,41,51,61,71,81,91,101,111,121,131,141,151,161,171,181,191,201,211,221,231,241,251,260,270,276,282,288,294,300,306,312,318,324,330,336,342,348,354,360,366,372,378,384,390,396,402,408,414],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":30},755327,1,"单选题","在尾矿管理中,认识最肤浅的仍然是尾矿库渗流及其携带()对地下水的影响。",[19,23,27],{"key":20,"text":21,"correct":22},"A","污染物",true,{"key":24,"text":25,"correct":26},"B","废弃物",false,{"key":28,"text":29,"correct":26},"C","矿物质","",{"id":32,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":34,"answer":28,"analysis":30},755329,"电气安全标志的作用是提示人们注意或区别各种电气线路和设备的性质和用途。表示不同的性质和用途的一般是用()来标志。",[35,37,39],{"key":20,"text":36,"correct":26},"数字",{"key":24,"text":38,"correct":26},"字母",{"key":28,"text":40,"correct":22},"颜色",{"id":42,"libraryId":5,"type":15,"typeLabel":16,"stem":43,"options":44,"answer":24,"analysis":30},755331,"电气检修工作中,曾多次发生过违章送电,导致检修人员伤亡的恶性事故。为了防止异常送电造成事故,可采取综合的技术措施和组织措施。下列有关送电的做法中,错误的是()。",[45,47,49],{"key":20,"text":46,"correct":26},"严格执行工作票制度和监护制度",{"key":24,"text":48,"correct":22},"严格按照计划工作时间送电",{"key":28,"text":50,"correct":26},"在被检修装置的电源开关上挂“禁止合闸,有人工作”的标示牌",{"id":52,"libraryId":5,"type":15,"typeLabel":16,"stem":53,"options":54,"answer":24,"analysis":30},755333,"对尾矿坝存在坝坡渗水,沼泽化、()偏高等不安全因素,应及时采取有效的治理措施。",[55,57,59],{"key":20,"text":56,"correct":26},"水边线",{"key":24,"text":58,"correct":22},"浸润线",{"key":28,"text":60,"correct":26},"轮廓线",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":20,"analysis":30},755334,"坝前沉积大片矿泥会抬高坝体内的浸润线,因此,在放矿过程中应尽量避免大量矿泥分布于()。",[65,67,69],{"key":20,"text":66,"correct":22},"坝前",{"key":24,"text":68,"correct":26},"坝后",{"key":28,"text":70,"correct":26},"坝中",{"id":72,"libraryId":5,"type":15,"typeLabel":16,"stem":73,"options":74,"answer":20,"analysis":30},755336,"溢流圈进浆口可低于埝顶()m左右。",[75,77,79],{"key":20,"text":76,"correct":22},"0.2",{"key":24,"text":78,"correct":26},"0.3",{"key":28,"text":80,"correct":26},"0.4",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":28,"analysis":30},755338,"对尾矿坝存在()渗水,沼泽化、浸润线偏高等不安全因素,应及时采取有效的治理措施。",[85,87,89],{"key":20,"text":86,"correct":26},"坝内",{"key":24,"text":88,"correct":26},"坝面",{"key":28,"text":90,"correct":22},"坝坡",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":30},755340,"对尾矿库进行巡回检查是及时发现尾矿库异常情况的重要(),应纳入尾矿库管理人员的岗位责任制。",[95,97,99],{"key":20,"text":96,"correct":26},"要求",{"key":24,"text":98,"correct":22},"途径",{"key":28,"text":100,"correct":26},"路径",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":24,"analysis":30},755342,"人工呼吸,每分钟约吹气()次。",[105,107,109],{"key":20,"text":106,"correct":26},"4-6",{"key":24,"text":108,"correct":22},"12-16",{"key":28,"text":110,"correct":26},"8-10",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":20,"analysis":30},755345,"灌浆处理裂缝灌浆的浆液,通常为()。",[115,117,119],{"key":20,"text":116,"correct":22},"粘土泥浆",{"key":24,"text":118,"correct":26},"碎石",{"key":28,"text":120,"correct":26},"矿浆",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":24,"analysis":30},755347,"主管与支管用特制的三通()。",[125,127,129],{"key":20,"text":126,"correct":26},"坝体",{"key":24,"text":128,"correct":22},"联结",{"key":28,"text":130,"correct":26},"抛土防渗",{"id":132,"libraryId":5,"type":15,"typeLabel":16,"stem":133,"options":134,"answer":24,"analysis":30},755349,"对于()堆积外坡的坡比,可通过实验或稳定分析计算后确定。",[135,137,139],{"key":20,"text":136,"correct":26},"前期",{"key":24,"text":138,"correct":22},"终期",{"key":28,"text":140,"correct":26},"后期",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":30},755351,"采用()是处理裂缝比较彻底的方法,适用于不太深的表层裂缝及防渗部位的裂缝。",[145,147,149],{"key":20,"text":146,"correct":26},"片石压坡",{"key":24,"text":148,"correct":22},"开挖回填",{"key":28,"text":150,"correct":26},"黄土护坡",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":30},755353,"尾矿库内排洪构筑物通常由进水构筑物和输水构筑物()。",[155,157,159],{"key":20,"text":156,"correct":26},"构成",{"key":24,"text":158,"correct":26},"合成",{"key":28,"text":160,"correct":22},"两部分组成",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":30},755355,"井下供电和电气应有漏电、()和过电流三大保护装置。",[165,167,169],{"key":20,"text":166,"correct":22},"接地",{"key":24,"text":168,"correct":26},"电缆",{"key":28,"text":170,"correct":26},"开关",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":24,"analysis":30},755357,"满足下列工况的为():(1)尾矿坝的最小安全超高和尾矿库的最小干滩长度均符合设计要求:(2)排水系统各构筑物符合设计要求,工况正常;(3)尾矿坝的轮廓尺寸符合设计要求,稳定安全系数及坝体渗流控制满足要求,工况正常。",[175,177,179],{"key":20,"text":176,"correct":26},"险库",{"key":24,"text":178,"correct":22},"正常库",{"key":28,"text":180,"correct":26},"危库",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":24,"analysis":30},755359,"在尾矿坝运行过程中如需增设或更新(),应经技术论证,并经企业安全管理部门批准。",[185,187,189],{"key":20,"text":186,"correct":26},"排洪设施",{"key":24,"text":188,"correct":22},"排渗设施",{"key":28,"text":190,"correct":26},"排水设施",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":28,"analysis":30},755361,"若渗水由清变浑,或明显的看到水中含有土颗粒,则属于()。",[195,197,199],{"key":20,"text":196,"correct":26},"接触渗漏",{"key":24,"text":198,"correct":26},"正常渗漏",{"key":28,"text":200,"correct":22},"异常渗漏",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":30},755363,"滑坡处理前还应在裂缝上方修截水沟,以拦截或()坝面的积水。",[205,207,209],{"key":20,"text":206,"correct":26},"坝高",{"key":24,"text":208,"correct":22},"引走",{"key":28,"text":210,"correct":26},"拦截",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":30},755365,"冰冻期、()或由于某种原因确需长期集中放矿时,不得出现影响后续堆积坝体稳定的不利因素。",[215,217,219],{"key":20,"text":216,"correct":26},"防汛期",{"key":24,"text":218,"correct":22},"事故期",{"key":28,"text":220,"correct":26},"建设期",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":30},755367,"在雷雨天不要走进高压电线杆、铁塔、避雷针的接地导线周围()m以内。",[225,227,229],{"key":20,"text":226,"correct":26},"10",{"key":24,"text":228,"correct":22},"20",{"key":28,"text":230,"correct":26},"30",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":30},755369,"为保证堆坝质量良好,应以()尾矿堆坝。",[235,237,239],{"key":20,"text":236,"correct":22},"粗颗粒",{"key":24,"text":238,"correct":26},"压力",{"key":28,"text":240,"correct":26},"粒度",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":28,"analysis":30},755371,"在处理冒顶片帮事故过程中,始终要有专人监测()情况,监测有害有毒气体浓度变化情况,发现异常,立即撤出救援人员。",[245,247,249],{"key":20,"text":246,"correct":26},"风向",{"key":24,"text":248,"correct":26},"温度",{"key":28,"text":250,"correct":22},"地压活动",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":28,"analysis":30},755373,"因土坝渗漏而引起的背水坡滑坡,应同时在迎水坡进行()。",[255,257,259],{"key":20,"text":256,"correct":26},"检查",{"key":24,"text":258,"correct":26},"观赛",{"key":28,"text":130,"correct":22},{"id":261,"libraryId":5,"type":262,"typeLabel":263,"stem":264,"options":265,"answer":269,"analysis":30},755375,3,"判断题","每年雨季前保持原设计的调洪容积和泄洪能力,以保证洪水畅通排入。",[266,268],{"key":20,"text":267,"correct":26},"正确",{"key":24,"text":269,"correct":22},"错误",{"id":271,"libraryId":5,"type":262,"typeLabel":263,"stem":272,"options":273,"answer":267,"analysis":30},755377,"做人工呼吸前,应使伤员仰卧,救护者在其头的一侧用手将其鼻孔捏住,以免吹气时从鼻孔漏气。",[274,275],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":277,"libraryId":5,"type":262,"typeLabel":263,"stem":278,"options":279,"answer":269,"analysis":30},755379,"尾矿库水位检测,其测量误差不应小于20mm。",[280,281],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":283,"libraryId":5,"type":262,"typeLabel":263,"stem":284,"options":285,"answer":267,"analysis":30},755380,"进水构筑物的基本型式有排水井、排水斜槽、溢洪道以及山坡截洪沟等。",[286,287],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":289,"libraryId":5,"type":262,"typeLabel":263,"stem":290,"options":291,"answer":267,"analysis":30},755382,"渗流量是直接反映渗流场动态的主要水力要素之一。",[292,293],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":295,"libraryId":5,"type":262,"typeLabel":263,"stem":296,"options":297,"answer":269,"analysis":30},755384,"随着矿石开采量和处理量不断增加,尾矿量日益减少。",[298,299],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":301,"libraryId":5,"type":262,"typeLabel":263,"stem":302,"options":303,"answer":269,"analysis":30},755385,"片面追求回水水质而抬高库水位,造成调洪库容大。",[304,305],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":307,"libraryId":5,"type":262,"typeLabel":263,"stem":308,"options":309,"answer":267,"analysis":30},755387,"非紧急情况,未经技术论证,不得用常规子坝挡水。",[310,311],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":313,"libraryId":5,"type":262,"typeLabel":263,"stem":314,"options":315,"answer":269,"analysis":30},755389,"堆石坝的上游坡面一般设有反滤层,反滤层一般采用砂、砾、卵石或碎石等三层组成,粒度沿渗流方向由粗至细。",[316,317],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":319,"libraryId":5,"type":262,"typeLabel":263,"stem":320,"options":321,"answer":267,"analysis":30},755391,"直径较大的机械浓缩池一般采用周边传动,直径较小的机械浓缩池一般采用中心传动。",[322,323],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":325,"libraryId":5,"type":262,"typeLabel":263,"stem":326,"options":327,"answer":267,"analysis":30},755392,"发现安全隐患时,应及时处理并向企业主管领导报告。",[328,329],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":331,"libraryId":5,"type":262,"typeLabel":263,"stem":332,"options":333,"answer":269,"analysis":30},755394,"如果触电者伤势较重,已失去知觉、心跳存在,应通过摇晃、冷水刺激等手段使其迅速清醒过来。",[334,335],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":337,"libraryId":5,"type":262,"typeLabel":263,"stem":338,"options":339,"answer":269,"analysis":30},755396,"开挖回填工作中新旧土体的结合面刨毛不利结合。",[340,341],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":343,"libraryId":5,"type":262,"typeLabel":263,"stem":344,"options":345,"answer":267,"analysis":30},755398,"遇有非常情况,应采取紧急措施,严格防止洪水漫坝。",[346,347],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":349,"libraryId":5,"type":262,"typeLabel":263,"stem":350,"options":351,"answer":267,"analysis":30},755400,"险情面积较大,地形适合而附近又有土料时采用蓄水减渗。",[352,353],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":355,"libraryId":5,"type":262,"typeLabel":263,"stem":356,"options":357,"answer":267,"analysis":30},755402,"将放矿主管内矿浆引流排入尾矿库的管道,称为放矿支管。",[358,359],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":361,"libraryId":5,"type":262,"typeLabel":263,"stem":362,"options":363,"answer":269,"analysis":30},755404,"多管大流量放矿方式利于尽快形成滩面。",[364,365],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":367,"libraryId":5,"type":262,"typeLabel":263,"stem":368,"options":369,"answer":269,"analysis":30},755406,"当位移量变化出现突变或有增大趋势时,不应查明原因,妥善处理。",[370,371],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":373,"libraryId":5,"type":262,"typeLabel":263,"stem":374,"options":375,"answer":269,"analysis":30},755408,"使用救护器材是专业人员事,现场人员不得使用。",[376,377],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":379,"libraryId":5,"type":262,"typeLabel":263,"stem":380,"options":381,"answer":269,"analysis":30},755410,"尾矿库的干滩越长,其浸润线越低。",[382,383],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":385,"libraryId":5,"type":262,"typeLabel":263,"stem":386,"options":387,"answer":267,"analysis":30},755412,"尾矿库观测的一部分工作内容可用肉眼进行,如观测坝有无明显的变形、塌坑、沼泽、渗水、裂缝及蚁穴鼠洞等。",[388,389],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":391,"libraryId":5,"type":262,"typeLabel":263,"stem":392,"options":393,"answer":269,"analysis":30},755414,"电气设备的绝缘损坏和性能不良不会引发矿山火灾。",[394,395],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":397,"libraryId":5,"type":262,"typeLabel":263,"stem":398,"options":399,"answer":269,"analysis":30},755416,"排渗部件如排渗盲管被矿泥堵塞,致使排渗效果变差,没有好办法处理。",[400,401],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":403,"libraryId":5,"type":262,"typeLabel":263,"stem":404,"options":405,"answer":267,"analysis":30},755418,"电工或机电设备操作人员的操作失误,违章作业可能会产生触电。",[406,407],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"id":409,"libraryId":5,"type":262,"typeLabel":263,"stem":410,"options":411,"answer":269,"analysis":30},755419,"每100m坝长选较低处检测1~2个点,但总数不少于2个点。",[412,413],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"id":415,"libraryId":5,"type":262,"typeLabel":263,"stem":416,"options":417,"answer":269,"analysis":30},755421,"坝的总坝高为50米的尾矿坝一定是第四等尾矿库。",[418,419],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},[421,424,427,429,432,435],{"id":422,"name":423,"category":7,"favorite":15},401,"高处安装、维护、拆除",{"id":425,"name":426,"category":7,"favorite":8},335,"(A)特种设备安全管理",{"id":428,"name":426,"category":7,"favorite":8},336,{"id":430,"name":431,"category":7,"favorite":8},340,"D1压力管道巡检维护",{"id":433,"name":434,"category":7,"favorite":8},343,"(G1)工业锅炉司炉",{"id":436,"name":437,"category":7,"favorite":8},353,"(N1)叉车司机"]