[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-755454":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},755454,432,3,"判断题","1、2级山谷型尾矿坝的渗流应按三维计算或由模拟试验确定。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"尾矿作业","特种作业",0]