[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-755363":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},755363,432,1,"单选题","滑坡处理前还应在裂缝上方修截水沟,以拦截或()坝面的积水。",[11,15,19],{"key":12,"text":13,"correct":14},"A","坝高",false,{"key":16,"text":17,"correct":18},"B","引走",true,{"key":20,"text":21,"correct":14},"C","拦截","",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]