[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-755317":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},755317,432,1,"单选题","当采用排水斜槽方案排洪时,为了适应排矿口的位置的不断变化,需根据地形条件和排洪量大小确定斜槽的断面和敷设()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","坡度",true,{"key":16,"text":17,"correct":18},"B","角度",false,{"key":20,"text":21,"correct":18},"C","高度","",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]