[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-755151":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},755151,432,1,"单选题","观测坝体的浸润线最常用的方法是选择有()的且能够控制主要渗流情况的坝体横断面,以及预计有可能出现异常渗流的横断面作为浸润线观测断面。",[11,15,19],{"key":12,"text":13,"correct":14},"A","代表性",true,{"key":16,"text":17,"correct":18},"B","渗水逸出",false,{"key":20,"text":21,"correct":18},"C","坝体高差","",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]