[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-755143":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},755143,432,1,"单选题","检查尾矿库沉积干滩的平均坡度时,每()m坝长布置不少于1~3个断面。",[11,15,18],{"key":12,"text":13,"correct":14},"A","300",false,{"key":16,"text":17,"correct":14},"B","200",{"key":19,"text":20,"correct":21},"C","100",true,"",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]