[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-755085":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},755085,432,1,"单选题","()施工中清基不彻底、坝体密实度不均、坝料不符合要求、反滤层铺设不当等,会造成坝体沉降不均、坝基或坝体漏矿、后期坝局部塌陷。",[11,15,18],{"key":12,"text":13,"correct":14},"A","中期坝",false,{"key":16,"text":17,"correct":14},"B","后期坝",{"key":19,"text":20,"correct":21},"C","初期坝",true,"",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]