[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-754900":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},754900,432,1,"单选题","遇有特大暴雨,发生()圈梁泄水孔排洪能力不足时,要迅速停止尾矿输送,分别采取乘船强行拆除圈梁降低排洪高度、降低库区水位和水泵抽水或从库外引山体排水沟泄洪等措施。",[11,15,18],{"key":12,"text":13,"correct":14},"A","排矿",false,{"key":16,"text":17,"correct":14},"B","排渗井",{"key":19,"text":20,"correct":21},"C","排水井",true,"",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]