[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-754862":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},754862,432,1,"单选题","当发现坝面局部隆起、()、流土、管涌、渗水量增大或渗水变浑等异常情况时,应立即采取措施进行处理并加强观察。",[11,15,19],{"key":12,"text":13,"correct":14},"A","塌陷",true,{"key":16,"text":17,"correct":18},"B","塌方",false,{"key":20,"text":21,"correct":18},"C","坍塌","",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]