[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-754854":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},754854,432,1,"单选题","开挖回填工作应分段进行,并保持允许的()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","坝体渗漏",false,{"key":16,"text":17,"correct":14},"B","滑坡",{"key":19,"text":20,"correct":21},"C","开挖边坡",true,"",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]