[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-754721":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},754721,432,1,"单选题","当尾矿坝位于不透水地基上或初期坝为不透水坝时,常采用底部排渗设施,以降低()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","水边线",false,{"key":16,"text":17,"correct":18},"B","浸润线",true,{"key":20,"text":21,"correct":14},"C","坝轴线","",{"id":6,"name":24,"category":25,"favorite":26},"尾矿作业","特种作业",0]