[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-743321":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},743321,425,3,"判断题","新盘根安装时,要求接口两端的间隙越大越好,盘根压紧到最大限度后,拧回0.5~2.5扣,至盘根有水滴出为止。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"排水作业","特种作业",0]