[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-743091":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},743091,425,3,"判断题","交班人要将交接班记录本中的项目、各项数据向接班人交清,接班人要逐项认可,然后双方签字,对交接班内容负责。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"排水作业","特种作业",0]