[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-682901":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},682901,416,1,"单选题","凸模装配后要复查凸模与固定板的垂直度、凸模与()的配合状态以及固定板与卸料板的平行度精度后，磨削凸模组件上下端面。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","上模座",false,{"key":16,"text":17,"correct":14},"B","固定板",{"key":19,"text":20,"correct":21},"C","卸料板型孔",true,{"key":23,"text":24,"correct":14},"D","导料板","",{"id":6,"name":27,"category":28,"favorite":29},"钳工（高级）","技能鉴定",0]