[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-680878":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},680878,414,1,"单选题","开模过程也分三个阶段，其中( )快速开模，以缩短开模时间。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","第一阶段",false,{"key":16,"text":17,"correct":18},"B","第二阶段",true,{"key":20,"text":21,"correct":14},"C","第三阶段",{"key":23,"text":24,"correct":14},"D","第一、三阶段","",{"id":6,"name":27,"category":28,"favorite":29},"钳工（中级）","技能鉴定",0]