[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-726329":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},726329,411,1,"单选题","在地下开采的岩体移动范围内(包括10m~20m保护带),除非采取有效的技术措施,否则不应同时进行()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","露天开采",true,{"key":16,"text":17,"correct":18},"B","地下开采",false,{"key":20,"text":21,"correct":18},"C","矿石运输","",{"id":6,"name":24,"category":25,"favorite":26},"安全检查作业（地下矿山）","特种作业",0]