[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-724471":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},724471,406,3,"判断题","检修动火时,动火时间一次绝不能超过一天。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"一般检修动火时间不超过一天，在特殊情况下，动火时间不超过三天 。但每天工作结束，人员离开现场时，必须检查消除火种，次日开工动火前工作负责人、监护人应先检查安全措施，并进行气体化验合格，以防运行方式改变破坏原有措施。",{"id":6,"name":21,"category":22,"favorite":23},"熔化焊接与热切割","特种作业",0]