[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-722103":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},722103,401,3,"判断题","人工拆除施工应从上至下、逐层拆除分段进行,不得垂直交叉作业。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"根据《建筑拆除工程安全技术规范》(JGJ147-2004)， 人工拆除施工应从上至下，逐层拆除，分段进行，不得垂直交叉作业，作业面的孔洞应封闭。",{"id":6,"name":21,"category":22,"favorite":23},"高处安装、维护、拆除","特种作业",1]