[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-722084":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},722084,401,3,"判断题","大型静置设备、设施拆除工程开工前,应根据工程特点、设备、设施情况、工程量等编制安全专项方案,应经项目经理签字批准后实施。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"大型静置设备、设施拆除工程开工前，应根据工程特点、设备、设施情况、工程量等编制安全专项方案，应经技术负责人或监理工程师签字批准后实施。施工过程中，如需变更，应经原审批人审批后实施。",{"id":6,"name":21,"category":22,"favorite":23},"高处安装、维护、拆除","特种作业",1]