[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721996":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},721996,401,3,"判断题","立管暗装时,每层每趟立管从上至下统一吊线安装卡件,高度一致;将预制好的立管按编号分层排开,顺序安装,对号调直时的印记。校核预留甩口的高度、方向是否正确。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"立管暗装时，立管安装后吊直找正，校核预留甩口高度、方向是否正确。准确无误后进行防腐处理并用卡件固定牢固。",{"id":6,"name":21,"category":22,"favorite":23},"高处安装、维护、拆除","特种作业",1]