[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721917":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},721917,401,3,"判断题","整体组立杆塔和分解组立杆塔施工方法相同部分,应按整体组立杆塔的安全规定执行。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"整体组立杆塔和分解组立杆塔施工方法相同部分，应按分解组立杆塔的安全规定执行。分解组立杆塔：将整基铁塔分解成段、片或各个单肢，然后利用起重机械等机具按分段、分片进行吊装。",{"id":6,"name":21,"category":22,"favorite":23},"高处安装、维护、拆除","特种作业",1]