[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-721741":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},721741,401,3,"判断题","拆除后的垃圾应适当存放现场,拆除结束后一起运走,合理利用垃圾清运车。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"《建筑拆除工程安全技术规范》该地区，拆除后的垃圾应及时运走，现场垃圾堆放总量不得超过60m³。",{"id":6,"name":21,"category":22,"favorite":23},"高处安装、维护、拆除","特种作业",1]